
FROM PROTOTYPE TO REPEAT ORDERS
Choose the production stage that fits.
Align manufacturing effort with design maturity, quantity, inspection and the next assembly step.

PRODUCTION STAGES
Move forward with a defined scope


Pilot / Low Volume
Confirm the manufacturing and inspection route across a small build.
Explore Pilot / Low Volume ↗
Repeat Production
Align drawing revisions, traceability and recurring requirements.
Explore Repeat Production ↗ENGINEERING PLANNING REFERENCE
Put numbers on the requirements.
Industry benchmarks for preparing your RFQ. The drawing review confirms the manufacturing route, capability and delivery schedule.
General metal features
A useful general-tolerance discussion point. State the drawing standard and dimension range; one blanket value does not cover every feature.
Selected critical features
A precision target for review, not a default for the whole part. Material, geometry, setup, temperature and measurement method matter.
Axis strategy
Compare 3-axis, indexed and simultaneous machining around tool access and datum control. The quotation confirms the proposed route.
Quantity comparisons
Use these RFQ quantities to compare prototype, pilot and repeat-part pricing. These are planning scenarios, not a stated MOQ.
Prototype schedule discussion
An initial manufacturing-window assumption for simple, stock-material parts. Finishing, inspection, capacity and shipping require separate confirmation.
Surface requirement example
An as-machined roughness discussion point. Identify functional faces; sealing, bearing and cosmetic surfaces may need different requirements.
Send overall dimensions and critical features for feasibility review. Production lead time starts from the agreed release conditions; transit time is separate.
LET’S TALK ABOUT YOUR PART
Bring your drawing.
Define the next step.
Material, quantity, finish and critical features — start with what you know.